The installation of a 40 x 100 ft dome greenhouse in Tanjung Karang has been successfully completed within one month. This project covered several key phases, including site preparation, dome frame assembly, greenhouse covering installation, construction of a seedling nursery, and the setup of a comprehensive irrigation system complete with a tank and water pump. The dome structure is specially designed to ensure stable temperature and humidity levels, providing an optimal environment for plant growth. The greenhouse is now fully operational and is expected to enhance crop yield through more efficient and systematic management.
Drilling and Installation of Tube Well at RPS Dala, Gerik, Perak
- Category: Constructions, Tubewell Drilling
- 2024
- Status: Completed